Water / Waste Water Project Experience

shutterstock_181330688.jpg

Telemetry

ACWWA
MTU programming architecture

RTU & control system support (collections & distribution)

Himalaya Vault Telemetry Integration

Elkhorn Booster Pump Station Telemetry updates and well integration

Telemetry network optimization

oilandgas_control_systems.jpg

Engineering

Over 30 Engineering Projects

Consolidated Mutual Water
Design/Build of Pump Station Control Systems, Telemetry Architecture, and HMI Screens.

Design/Build of new Maplegrove WTP SCADA Server Architecture, Database Architecture, and HMI Screens.

Design/Build of new Dewatering Building SCADA System instrumentation, Fiber Network, HMI Screens, and Database Architecture.

ACWWA
Design/Build of control systems, and SCADA integration of new water well and chlorination vault.

3rd party design review (well install)
control system and telemetry upgrades (pump station)

Aurora
Radio network improvements and reporting set up (Sonde)

EcoVapor
Control system design (oxygen destruction)

EcoVapor
Telemetry system management (cell radios at RTU's)

homepage 1.jpg

System Integration

100+ RTU Integrations
100+ RTU Designs

Centennial

1 waste water treatment plant integration (1 MGD)

Evergreen
1 waste water treatment plant integration (0.5 MGD)

Gold Mine
1 industrial waste water plant (100 GPM)

Kinross
1 Biotreatment plant

Thornton
1 booster pump station (1 MGD)

ACWWA
Himalaya Vault Telemetry and SCADA integration (1 MGD)

Elkhorn Vault Telemetry and SCADA Integration (300 GPM)

Kinross
1 Telemetry System (30 monitoring sites)

Waste Management
Landfill Flare (30+ flare monitoring units)

EcoVapor
Vapor Recovery Systems (20 systems)